Skip to content

Fruit Installation

Categoria:Food industry

Ano: 2017

Local:Moimenta da Beira

País:Portugal

Prefabrication and assembly of pipes and metal structures for a fruit plant composed of:

  • Machines Room
  • 26 Controlled Atmosphere Chambers
  • 5 Normal Atmosphere Chambers
  • 3 Refrigerated Corridors