Skip to content

Turbos Installation – Runtech

Categoria:Paper Industry

Ano: 2016 / 2017

Local:Europa&c Kraft Viana - Viana do Castelo

País:Portugal

Demolition of concrete structures, removal of vacuum pumps, piping and existing equipment. Construction of new concrete elements, assembly of turbos and auxiliary equipment. Prefabrication and assembly of piping of turbos and ecodrops connections to existing vacuum and exhaust lines, prefabrication and assembly of washing water lines for turbos and ecodrops, cooling of hydraulic units and connection to pumps.